Skip to main content

General Contractorin Roswell, Georgia

Licensed, bonded, and insured general contractor serving Roswell and North Fulton. BCG handles luxury residential renovations, custom homes, Canton Street restaurant build-outs, boutique commercial tenant improvements, and historic-district construction planning.

  • Luxury Homes & Renovations
  • Restaurant & Retail TI
  • Boutique Commercial Build-Outs
  • Historic District Planning

Get Your Roswell Estimate

Tell us about your Roswell project. Detailed estimate within 48 hours.

GA
State Licensed
Fulton
Fulton County
48hr
Estimates Delivered
2016
Established
Georgia · North Fulton · Historic District & Chattahoochee BCG general contractor construction project in Roswell, GA - North Fulton

Construction Expertise
for Roswell, GA

Roswell construction can involve city permitting, historic-district review, tree protection requirements, and Chattahoochee River corridor controls. Bowser Construction Group plans around those local conditions for residential renovations, custom homes, restaurant construction, and commercial tenant improvements. BCG completed the Kabob Land restaurant build-out at 1055 Mansell Road, Suite 150, Roswell, GA 30076 in 2020.

Roswell Market & Regulatory Intelligence
RLCO005106
Georgia General Contractor
License
Bowser Construction Group
State of Georgia
Trees
Site Planning
Protection Review
Confirm before disturbance
City of Roswell requirements
MRPA
Chattahoochee River
Corridor Review
Parcel-specific controls
Metropolitan River Protection Act
HPC
Historic Preservation Comm.
Canton Street Overlay
Pre-application meeting advised
City of Roswell

What You Need to Know Before Building in Roswell

Historic District Overlay - Canton Street

Roswell's Downtown Historic District and the Canton Street commercial corridor have specific design review requirements for any exterior work visible from the public right-of-way. The Roswell Historic Preservation Commission reviews applications involving historic overlay parcels. BCG coordinates with the HPC before finalizing commercial plans.

HPC review before plan finalization

Tree Protection Review

Roswell regulates tree removal and land disturbance, so the existing tree inventory should be reviewed before site plans are finalized. The required documentation depends on the parcel and scope. BCG incorporates tree-protection questions into pre-construction planning for additions, new homes, and other work that changes the site.

Review trees before site design

Chattahoochee River Corridor Controls

Property near the Chattahoochee may be subject to the Metropolitan River Protection Act, stream-buffer requirements, floodplain controls, and other parcel-specific restrictions. The applicable limits must be confirmed through surveys and agency review before a buildable area is assumed. BCG uses that due diligence to guide early design decisions.

Confirm constraints before design

Canton Street Restaurant & Retail Work

Canton Street combines restaurant and retail activity with older buildings and historic-district considerations. Existing electrical, HVAC, plumbing, accessibility, and structural conditions should be documented before a tenant-improvement budget is finalized. BCG completed the Kabob Land restaurant build-out at 1055 Mansell Road in Roswell in 2020.

Existing-condition review matters

Established Neighborhood Renovations

East Roswell, Chimney Lakes, and Martin's Landing contain established homes where owners may need kitchen expansions, additions, basement conversions, or broader renovations. BCG evaluates existing conditions, access, utilities, and permit requirements before defining the construction sequence.

Existing conditions guide scope

Highway 92 and Old Roswell Road

Commercial projects along Highway 92 and Old Roswell Road can involve land-use review, building permits, utility coordination, and tenant-specific requirements. For property inside Roswell city limits, the City of Roswell Community Development Department is the primary local permitting authority.

Confirm jurisdiction first

Roswell Construction Services

Luxury Custom Homes & Major Renovations

From custom homes near the Chattahoochee corridor to major renovations in established Roswell neighborhoods, BCG coordinates existing-condition review, site constraints, design-build planning, and permit management before construction begins.

Budgets depend on site conditions, design, selections, utility work, and permitting requirements.

Custom Home Details →

Restaurant & Commercial Tenant Improvements

Roswell restaurant, retail, office, and medical build-outs require close coordination among the existing building, tenant program, permit set, and construction sequence. BCG's confirmed local experience includes the Kabob Land restaurant build-out at 1055 Mansell Road, Suite 150, completed in 2020.

A reliable budget starts with field verification of existing utilities, structure, accessibility, and building systems.

Restaurant Construction Details →

Home Additions & Accessory Structures

Master suites, garage conversions, screened porches, home offices, and detached structures can require zoning, site, tree, structural, and building-code coordination. BCG uses design-build planning to align the proposed scope with the property and permit requirements before drawings are finalized.

Addition pricing varies with foundations, tie-ins, access, finish level, and upgrades to the existing house.

  • Master suite and living-space additions
  • Screened porches and covered outdoor living
  • Detached garages and accessory structures
  • Basement finishing and conversion
  • Whole-home renovation planning
  • Design-build planning for additions with complex site constraints
Additions Details →

Where We Build in Roswell

Canton Street / Historic District

Roswell's luxury restaurant and retail corridor. Commercial TI requires Historic Preservation Commission review for exterior changes. BCG pre-coordinates with HPC staff before plans are drawn.

Restaurant · Retail · Historic

Chattahoochee Riverfront

River-adjacent property may involve Metropolitan River Protection Act review, stream buffers, floodplain controls, and other parcel-specific constraints that should be confirmed before design.

Luxury Residential · Waterfront

East Roswell

1980s-1990s residential stock in a renovation cycle. Full-gut renovations, master suite additions, kitchen expansions.

Residential Renovation

Martin's Landing / Chimney Lakes

Established community with active renovation market. HOA oversight in some communities. Strong owner-occupant reinvestment rate.

Residential Renovation · HOA

Hwy 92 Commercial Corridor

Medical offices, urgent care, and specialty retail along Highway 92. City of Roswell permit jurisdiction. Active development pipeline.

Medical · Commercial

Crabapple-Adjacent / Old Roswell Road

Residential and commercial zone connecting Roswell to Milton. Mix of estate custom homes and commercial TI. BCG knows the City of Roswell versus Fulton County jurisdiction line here.

Custom Residential · Commercial

Serving Georgia & Florida

Headquartered in Cumming, GA with a second office in Winter Park, FL.

GA

Georgia Construction

Headquartered in Cumming, GA
FL

Florida Construction

Serving Florida clients, FL CGC pending

Serving Central Florida and the greater Orlando metro. Florida CGC license pending.

Construction FAQs for Roswell

Yes. Bowser Construction Group completed the Kabob Land restaurant build-out at 1055 Mansell Road, Suite 150, Roswell, GA 30076 in 2020. That verified Roswell project gives BCG a specific local reference for owners evaluating a general contractor for restaurant construction or a commercial tenant improvement. BCG uses early site review to identify the existing building conditions, utility needs, permit responsibilities, and construction sequence that can affect a restaurant schedule and budget. Learn more about BCG's restaurant construction services.

Yes. Roswell tree-protection requirements can affect additions, custom homes, accessory structures, driveways, grading, and other work that disturbs a site. The required tree information and review depend on the parcel and project scope, so owners should not assume that a conceptual footprint is buildable before the existing trees and site constraints are evaluated. Bowser Construction Group incorporates tree-protection questions into pre-construction planning and coordinates the design team around the confirmed requirements. This reduces the risk of redesign after architectural or engineering work is already advanced. See BCG's home addition and renovation services.

A Canton Street project may require Roswell Historic Preservation Commission review when the property is within a historic district or the proposed scope affects regulated exterior features. Interior-only work and exterior changes do not always follow the same review path, so the parcel status and proposed design should be confirmed before the permit set is finalized. Bowser Construction Group coordinates early review questions with the project architect and the City of Roswell Community Development Department, helping the team distinguish building-permit work from historic-design approval. This is especially important for commercial tenant improvements in older downtown buildings.

Yes, but river-adjacent property in Roswell can be subject to several overlapping controls. Depending on the parcel, these may include the Metropolitan River Protection Act, stream buffers, floodplain requirements, local zoning, and restrictions associated with nearby protected land. A universal setback should not be assumed from the street address alone. Bowser Construction Group recommends confirming boundaries, elevations, easements, and agency requirements before treating a conceptual footprint as buildable. That due diligence gives the architect and owner a reliable basis for custom-home or renovation planning near the Chattahoochee corridor. Explore BCG's custom-home construction services.

For property within Roswell city limits, the City of Roswell Community Development Department is the primary local authority for building permits and related development review. A Roswell mailing address does not always prove that a parcel is inside the city, so jurisdiction should be confirmed before plans are submitted. Projects outside the incorporated city may instead fall under Fulton County or another local authority. Bowser Construction Group verifies jurisdiction during pre-construction, then coordinates the permit set with the applicable planning, building, fire, health, and utility reviewers based on the actual scope. Review duration varies by project and should be confirmed for the current submission.

Ready to Build in Roswell?

BCG is headquartered in Cumming and serves Roswell, including Canton Street, Mansell Road, established residential neighborhoods, and properties near the Chattahoochee corridor. BCG completed the Kabob Land restaurant build-out at 1055 Mansell Road in 2020. For complex residential and commercial scopes, the team coordinates design-build planning before permit submission so verified site constraints, budget priorities, and construction sequencing can be aligned early.

Georgia general contractor license RLCO005106. Serving Roswell, Alpharetta, Johns Creek, Milton, Cumming, and North Fulton.

Get a Free Estimate

Tell us about your Roswell project and request a free estimate.